[Usage Example] New Construction of Powder Mixing and Shipping Equipment
Introducing a case where mixed equipment and screw conveyors were newly installed over a period of two months!
We would like to introduce a case of "new construction of powder mixing and shipping equipment" carried out for a company in Saitama Prefecture that manufactures and sells construction materials and other products. The mixing equipment measures several types of powder raw materials with a scale and mixes them in a mixer, and the mixed products are transported to the product tank via a bucket elevator and screw conveyor. The shipping equipment is set up to ship the products using a jet pack truck or a flexible container bag. The construction period lasted for two months, and although there were times when the weather was not favorable, the project was successfully completed. If you are considering updating or installing new powder equipment, please feel free to contact us. 【Case Overview】 ■ Installation Location: A company in Saitama Prefecture that manufactures and sells construction materials and other products ■ Installed Equipment - Mixing Equipment - Screw Conveyor *For more details, please download the PDF or feel free to contact us.
- Company:SHOWA KOKI CO.,LTD
- Price:Other